The construction of Verdijk Transport’s new building will begin on industrial estate Saxe Gotha in Boxmeer in April. These new, modern premises will be larger than the size of 2 football fields and will be fully equipped for cross-docking and long-term storage of pharmaceutical products. The products can be stored at temperatures of +20ºC, +5ºC and at freezer temperatures.
The premises will be ready for commissioning by the end of 2017.